Cambridgeshire Pond Project

Great crested newt male

Great crested newt

Pond Funding for Cambridgeshire Landowners

Pond Creation and Restoration – Funding for Landowners in Cambridgeshire

The Wildlife Trust and Natural England are offering Cambridgeshire landowners the opportunity to restore or to create ponds at no cost to themselves.  Landowners take on a 25-year commitment to do routine maintenance, to retain the pond and to allow Wildlife Trust staff to access for occasional monitoring. 

Pond Requirements

Two great crested newts pictured in a white container

Great Crested Newts

The ponds are needed to provide habitat for the Great Crested Newt – a protected species whose population has declined dramatically across its European range. 

Ponds should be 150m2 to 300m2; with shallow edges and a central part around 1.5 - 2m deep. They should not be stocked with fish and there should be no duck houses. Some shading is acceptable, livestock access should be restricted.

The surrounding area is also important, as Great Crested Newts spend a large part of the year on land. Using the pond to breed and to lay eggs on emergent plants, they spend the autumn and winters in areas of rough grassland or similar habitat nearby, where they can remain undisturbed.  

A freshly dug pond with water and bare edges

Pond example: completed new pond

An established pond, 5 years after completion showig an abundance of foliage and growth around it

Pond example: completed pond five years later

About the Scheme

The District Level Licensing Scheme

The District Level Licensing (DLL) Scheme provides the funding. Operating in certain parts of the country, the Scheme gives developers the opportunity to speed-up their building projects whilst meeting legal requirements to protect Great Crested Newts by paying into a fund for ‘off-site compensation’. 

For every pond lost to development, four ponds are created or restored. In this way, Great Crested Newt populations are protected whilst development can go ahead.

The Scheme is led by Natural England, in Cambridgeshire working in partnership with the Wildlife Trust BCN and FWAG (East). 

How it works

Natural England has mapped Strategic Opportunity Areas, where land may be eligible for the scheme. Occasionally, it may be possible to fund ponds outside these Strategic Opportunity Areas.

For ponds that are in the right areas, we carry out initial checks to ensure the specific location is suitable, taking into account potential flood risk, any archaeology and existing habitat. 

If the site is good and the landowner decides to go ahead, the landowner signs an agreement, which is not legally binding, but commits the landowner to retaining the pond for a 25 year period.  

The landowner, contractor and the Wildlife Trust then meet on site to agree the specifications of the pond creation or restoration work. Landowners can either be paid to do the work themselves, or we can arrange a contractor to carry out the work in line with the Scheme’s requirements. The work is fully funded by the DLL Scheme.

After the work has been completed

We check the pond on completion and again after 3 months to see how the pond is settling down. We then revisit a few times in the next 5 years to carry out eDNA tests, which reveal the presence or absence of Great Crested Newts. 

After that visits will be very infrequent perhaps once every 7 years. Permission for access will always be sought prior to surveys and results will be shared with the landowner. 

Funding is available for remedial work over a 25-year period and any advice about the pond can be sought by contacting the Wildlife Trust BCN.

A pond with grassy banks